From field data to municipal submission.
Arbotic Twin helps tree-care firms, contractors, developers, and property owners clear GTA tree permits with fewer revisions — combining qualified arborist assessment with consistent 3D spatial documentation.
Why tree projects stall
Visual-only blind spots
Ground-only visual checks miss canopy geometry, lean angles, and structural context.
Permit revision loops
Incomplete or inconsistent arborist reports trigger costly municipal resubmissions.
Tree-failure liability
Without documented risk assessments, owners face avoidable exposure after a failure.
Arborist Reports & Permits
Removal, construction, pool, and development reports prepared against municipal by-laws and Terms of Reference.
Scaled Tree Protection Plans (TPP)
Tree locations, TPZ geometry, hoarding lines, and neighbour buffers built on your client-supplied survey or grading base.
TRAQ Tree Risk Assessment
Level 2 evaluations and Risk Level findings for hazard permits, mitigation planning, and property stewardship.
3D Evidence & B2B Drafting
Point-cloud documentation where needed, plus fast report and tree-plan drafting for tree firms and local signing arborists.
How a project runs
01 — Capture & locate
Site inspection, tree inventory, and 3D capture where needed.
02 — Review with you
Confirm scope, tree IDs, and mitigation options before finalising.
03 — Submission-ready report
Structured PDF report and scaled plans prepared for your submission.
Ready to scope a report or permit package?
Tell us the municipality, job type, and timeline — we will confirm scope and quote before work begins.